Model: BLG-03
Capacity: 3.12 m³
Inner size: L1200xW1000xH2600mm
Fuel: natural gas
Process capacity: 25kg/h coating
burn off oven efficiently strip off powder coating, paint from jigs, hangers and racks for suspending items on the conveyor line during painting.
Effective heating system design to highly decompose the organic material.
Independent second combustion chamber design to remove the smoke completely.
User-friendly – easy operation and maintenance.
Various options for different application.
Multiple security protection – self check to stop the oven automatically
Advanced touch-screen PLC control system
Paint & Powder Coating stripping (Racks, Jigs, Fixtures, Paint hooks and hangers)
Plastics stripping (Moulds, extrusion dies, screws, nozzles, extruders, hot runners, breaker plates)
Auto-Parts and Engine Rebuilding
Motor rebuilding
Oil removal from scrap metal
Power | 220V, 50Hz, 0.7kw, Single phase |
Coating Process Capacity | 25 kg/h |
Cycle Time | 90-120 min |
Overall Dimension (L x W x H) | 1700mm x 1600mm x 3700mm |
Inner Dimension (L x W x H) | 1200mm x 1000mm x 2600mm |
Cart Dimension (L x W x H) | 1000mm x 800mm x 500mm |
Cart Loading Dimension (L x W x H) | 1000mm x 800mm x 2100mm |
Fuel | Natural gas, LPG, LNG, Diesel oil |
Removable Organic Compound | Paint, power coating, plastic, resin, oil |
Primary Burner | Riello gas/light oil burner |
Afterburner | Riello gas/light oil burner |
Control Mode | PLC |
Working Temperature | 0-480°C (adjustable) |
Second Combustion Chamber Temperature | 700-900°C |
Fuel Consumption | 20-24 m³/h (for natural gas) 14-18 kg/h (for LPG, LNG) |
Contact: Alice
Phone:
E-mail: alicexu@ecoco-oven.com
Whatsapp:+86 18151380595
Add: Room 122-2, No.3 Business Building Shengyuan Community, Tinghu District, 224001, Yancheng City, Jiangsu, China
We chat